1. Demolition and dismantling (with all associated layers) – floor slabs in
basement, mezzanine slabs, elevator cores, roof slabs, partition walls,
facade stone.
2. Replacement of existing elevator cores and concreting of new ones.
3. Introduction of reinforced concrete walls for seismic protection.
4. Reinforcement of existing beams and mezzanine slabs with carbon strips.